Insulating (A-60) of bulkhead on MV "IVS KNOT"

Bulkhead between engine room and cargo holds were not insulated at all, necessary of A-60 fire barrier for carriage of loaded cargo. Works were carried out rapidly - total period of the installation took 10 days. A new method of insulation - SpreFix was used that made the overall process quicker. In total, 480 m2 was insulated with SpreFix and 50 m2 with Rockwool - Class approvals obtained.

View gallery
View gallery
View gallery
View gallery
View gallery
View gallery
View gallery
View gallery
Client
Island View Shipping
Vessel
"IVS KNOT"
Owner
IVS Bulk 511 PTE Ltd
Works
A-60 insulation of bulkhead
Year
2011
Place Performed
Muuga / Estonia